PAC continues to solicit and also encourage certified NYS MBE/WBE/SDVBE and New York State Small Business Enterprise Subcontractors & Suppliers and
City of Syracuse Certified MBE/WBE Subcontractors and Suppliers.
For a listing of NYS Certified M/W/DBE Contractors and Suppliers,
visit https://ny.newnycontracts.com, http://esd.ny.gov/mwbe.html or www.dasny.org
For a listing of NYS SDVOB Certified Suppliers and Contractors, visit https://online.ogs.ny.gov/SDVOB/search
For a listing of City of Syracuse Certified M/WBE Contractors and Suppliers, click the link below
City of Syracuse MWBE Directory
To submit a bid, click here
For Bid Opportunities, click here to be added to our isqft directory
Fax proposals to 315.343.9554 or email to Bids@pacassociates.com
PROJECTS BIDDING
SUNY Oswego Wilber Hall Roof Replacement
Bid Due: Tuesday, December 16th by Noon
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e706b885e6172b4a79b&C=50
Project includes Removal of the existing fully adhered black EPDM membrane and insulation roofing system down the existing concrete deck. Roof replacement will consist of a Modified SBS membrane system over a polyisocyanurate flat and tapered insulation system. Demolition and existing concrete deck infill will be required at the existing openings no longer in use, and other abandoned openings which are no longer required. Raising the existing roof edge will be required to accommodate the specified tapered insulation system heights. A new coping/fascia and roof edge metal system will be
installed to complete the watertight system. Reconfiguration of roof access points and ladders have been upgraded and
modifications to the roof access door will be required.
Scope of work: selective demolition, restoration of surfaces, asbestos abatement, lead safe work practices, pcb removal, cast in place concrete, structural steel, metal dreck, cold formed metal framing, metal grating stairs, metal fabrications, misc rough carpentry, prep for re-roofing, vapor barrier, water resistive barrier-self adhering, thermal insulation, rainscreen wall panels, SBS roofing, sheet metal flashing and trim, pre manufactured roof edge & coping systems, roof accessories (drains, piping etc), joint sealants, FRP doors frames and hardware, painting,
SUNY Oswego Shady Shores Upgrades First Floor Framing Reinforcement
Bid Due: Thursday, December 11th @ Noon
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e706b86596376ac9f6c&C=50
Project includes repair and replacement of first floor wood framing within the existing residence. Limited asbestos abatement will be required to access framing to repair as shown on drawings and specs.
Liverpool CSD 2024 Capital Project Ph 1
Bid Due: Tuesday, January 6th @ Noon
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e706a8d5f6675ae9e6b&C=50
Work consists selective demolition, asbestos abatement, cast underlayment, concrete polishing, reinforced concrete unit masonry, structural steel framing, metal fabrications, pipe railings, rough carpentry, architectural wood casework and millwork, thermal insulation, thermoplastic polyolefin roofing, firestopping, joint sealant, hollow metal doors and frames, flush wood doors, coiling counter doors, aluminum framed entrances and storefronts, fire resistive framed glazing assemblies, unit skylights, door hardware, glazing, floor prep, gypsum board assemblies, non-structural metal framing, tiling, acoustical ceilings, resilient flooring base and accessories, refinishing of terrazzo, resinous matrix terrazzo flooring, tile carpeting, sound absorbing wall and ceiling units, exterior painting, interior painting, visual display units, signage, folding panel partitions, toilet bath and laundry accessories, fire protection specialties, projection screens, gymnasium equipment, window shades, manufactured wood casework, countertops, entrance floormats and frames, telescoping bleachers
Pulaski CSD 2024 Capital Project
Bid Due: Wednesday, January 7th @ Noon
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e706b8960676eb5a89b&C=50
Scope of work: selective demolition, removal and disposal of asbestos, cast in place concrete, masonry restoration, structural steel, metal deck, pipe and tube railings, rough carpentry, interior finish carpentry, prep for re-roofing, EPDM roofing, roof specialties, roof accessories, penetration firestopping, joint sealants, hollow metal frames, flush wood doors, access doors and frames, aluminum entrances and storefronts, door hardware, glazing, non-structural metal framing, gypsum board, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, tile carpeting, interior painting, staining and transparent finishing, fire protection cabinets and accessories, fire extinguishers, roller window shades, manufactured plastic laminate casework, lab casework, work surfaces, plastic laminate clad countertops, entrance floor mats and frames, fixed seating, sitework, asphalt paving, site concrete work, granite curb, traffic signs, steel hand and safety railing, vinyl clad chain link fences and gates, sodded lawns, utilties
Fulton CSD 2023 District Wide Capital Ph 4
Bid Due Wednesday, January 7th @ 3pm
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e706b8960676fa572af&C=50
Scopes include: asbestos abatement, lead safe work practices, hydraulic cement underlayment, unit masonry, structural steel, rough carpentry, penetration firestopping, joint firestopping, joint sealants, non-structural metal framing, gypsum board, ceramic tile, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, interior painting, phenolic core toilet partitions, manufactured plastic laminate clad casework
POST BID PROJECTS
North Syracuse CSD 2023 Safety & Security Improvements
To access documents, visit https://personal.filesanywhere.com/guest/fs?v=8e70688f6166767a6eab&C=50
Scopes include: selective demolition, removal and disposal of asbestos, removal and handling of lead based paint, rehab of cast in place concrete fiber reinforced polymer reinforcement of concrete, cast in place concrete, hydraulic cement underlayment, unit masonry, structural steel framing, steel decking, cold formed metal framing, metal fabrications, pipe and tube railings, welded steel gratings, rough carpentry, finish carpentry, interior architectural wood work, re-roofing removals, thermal insulation, vapor retarders, KEE roofing system, roof specialties, roof accessories, penetration fire stopping, joint fire stopping, preformed joint seals, joint sealants, flush wood doors, FRP/Aluminum hybrid doors, overhead coiling doors, coiling counter shutters, aluminum framed entrances and storefronts, glazed aluminum curtain wall systems, security windows, door hardware, glazing, fire resistive opening and glazing, gypsum board shaft wall assemblies, non-structural metal framing, gypsum board, tiling, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, tile carpeting, interior painting, staining and transparent finishing, high performance coatings, panel signage, packaged transfer/receiver units, roller window shades, manufactured p lam casework, solid surfacing countertops, entry floor mats and frames,